"

15.0 Learning Outcomes

Learning Outcomes

At the end of this chapter, students will be able to:

  • Explain the importance of job scheduling in operations management.
  • Identify different job scheduling rules and their characteristics (e.g., FCFS, SPT, EDD, CR).
  • Apply various job scheduling rules to a given set of jobs and calculate performance metrics.
  • Compare the performance of different scheduling rules based on the calculated metrics.
  • Determine appropriate scheduling rules for different operational objectives (e.g., minimizing flow time, minimizing tardiness).
  • Analyze the impact of job sequencing on waiting times and overall efficiency.
  • Explain how to schedule jobs on multiple machines.
  • Apply techniques for assigning resources (e.g., cranes) to tasks (e.g., construction sites) to optimize allocation.

License

Icon for the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License

Operations Management Copyright © 2024 by Azim Abbas and Seyed Goosheh is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License, except where otherwise noted.